Case

High-density survey in challenging conditions of YNAO

Implementation of a unique high-density survey project completed in record time with high resolution achieved for geological condition forecasting.

Описание проекта

1 — 01
Achieving record productivity in Russia at the time of project implementation.
Achieving record productivity in Russia at the time of project implementation.
1 — 02
The project utilized unique geophysical equipment capable of withstanding high loads and ensuring consistently high data accuracy.
The project utilized unique geophysical equipment capable of withstanding high loads and ensuring consistently high data accuracy.
1 — 03
Use of proven data interpretation methods for more precise identification of saturation zones, faults, and layers.
Use of proven data interpretation methods for more precise identification of saturation zones, faults, and layers.